PINNED SYNCHRO Field - Update Task Start date based off Earliest Resource Status
I am not sure if this is planned or not, but when we have the ability to update Resource Status through SYNCHRO Field, there should be an option (or Automatic) to change the status of the Task from Planned to Started, and also update the date to r...
PINNED Have the ability to move widgets and tables to a second monitor
Screen real estate to see the model is getting smaller with more widgets and tools can we move widgets to a second monitor?

All ideas

Showing 1204

Infrastructure Cloud - Help Link only Show ProjectWise Link

When we use Infrastructure Cloud Link, and open SYNHCRO project, the Short Cut Link in top Right (just before Profile) still show ProjectWise link. I think need to change to SYNCHRO if we are opening SYNCHRO Project.
Indrawan Wijaya 5 days ago in SYNCHRO Control / Admin 0

Ability to concatenate multiple Bindings

Eg, Date+ProjectName+Region, all extracted from already existing bindings.
Arpit Prakash about 1 month ago in SYNCHRO Control / Forms 0

Ability to make Form field required using scripts

This is useful for cases where we want to make a field hidden by default, but it becomes visible and required based upon other related input. We can make fields required through workflow, but that is not available through initialization settings.
Arpit Prakash 16 days ago in SYNCHRO Control / Forms 0

Ability to copy Form Workflow from other existing Forms types


Arpit Prakash about 2 months ago in SYNCHRO Control / Forms 0

Ability to set Cascading list within a Grid control

Also, if there's only one option in a cascaded list, it should automatically get populated.
Arpit Prakash 12 days ago in SYNCHRO Control / Forms 0

Form PDF exported through Transition creates a folder structure regardless of not containing Attachments

The following settings always create a folder structure containing an empty Attachments folder. When manually exporting from the Grid, it exports just PDF if no Attachments are available -
Arpit Prakash 12 days ago in SYNCHRO Control / Forms 0

Return Actual Cost to Work Inspector/Progress webpage

I note the New/Enhanced Feature for SYNCHRO Perform removed "Actual Cost" from the Progress page of the Work Inspector in 9-Jun-2024 update. This page reports "Revised Earned Cost" which is linked to the actual progress. This information is most u...
Ernest Downes 22 days ago in SYNCHRO Perform / Progress Measurement 0

Ability to map the date tied with a Signature control seperately to a fillable pdf

Arpit Prakash 7 days ago in SYNCHRO Control / Forms 0

Place the attachments in a PW folder

Each time attachments are added to a form, they should be saved directly to a specific folder in the project.
Yessica Barbosa 7 days ago in SYNCHRO Field / Documents | Connections 0

Ability to link to a specific sheet within Plan Set or Specifications

No description provided
Arpit Prakash 13 days ago in SYNCHRO Control / Plan Sets 0