Skip to Main Content
Need Support? Let’s guide you to the right answer or agent.
ADD A NEW IDEA

Pinned ideas

View all
PINNED Publish from PW Create Rendition to SYNCHRO Control PDF
Can ProjectWise ICS printing of PDF publish directly to a SYNCHRO Control Project?
PINNED Have the ability to move widgets and tables to a second monitor
Screen real estate to see the model is getting smaller with more widgets and tools can we move widgets to a second monitor?

SYNCHRO Control

Showing 778

Enable adding user-defined tags to projects

With user-defined tags, users can better organize, sort, and communicate the purpose and nature of a project instance. For example, a project instance can be used as a what-if scenario, which will be easier to sort with a what-if tag.
Johannes Yu 10 months ago in SYNCHRO Control / Admin / Reports 0

In a Math Action we need to be able to control how many decimal places we want the result to be

In a Math Action we need to be able to control how many decimal places we want the result to be.
David Dudek 2 months ago in SYNCHRO Control 0

Ability to push Form/Inspection definition updates from a template project to production projects

Currently, we have to go to each production project and reprovision them to get the latest updates from the template. It would be ideal to push the updates directly from the template project to all production projects, selected through a list.
Arpit Prakash about 1 year ago in SYNCHRO Control / Forms 1 Planned

Automated Field Matching for PDF Printouts

The goal is to enhance Synchro Control's printout configuration by enabling the tool to automatically recognize and match fields configured in a PDF with the corresponding bindings in the form. This feature aims to significantly reduce the manual ...
Yessica Andrade Barbosa 8 months ago in SYNCHRO Control / Forms 0

Add a Data Center in Latin America

For South American countries, the closest Data Center is East US. The incorporation of a Data Center for this region is urgently needed (Azure has a Data Center in Brazil, right?), since the collaborative work based on the SYNCHRO Control cloud pr...
Jean Delgadillo almost 2 years ago in SYNCHRO Control / Admin 1

Contractor RFI Usage

It would be ideal be able to select the contract package and RFI is associated with. IE: SC01 - Civil Site, SC02 - Foundations, SC03 - Electrical, and on the RFI number it could be auto numbered as RFI-SC01-0001, RFI-SC02-0001. Allowing Contractor...
Guest over 2 years ago in SYNCHRO Control / Admin 0 Future consideration

Add the ability to create schedules for many models of one SynchroControl project.

Currently only one SynchroControl project model can be configured for the scheduling service ("Set up this iModel for scheduling service"). When a project is large in size or diligent, it is more convenient to split it into several models. Moreove...
Guest over 4 years ago in SYNCHRO Control / Admin 0 Future consideration

To have 2D coming from a .sp file displayed in Synchro Control

User has loaded in Synchro™ 4D Pro a 2D .dwg drawing to create the 4D animation. Once uploaded in Synchro Control the lines coming from the 2D .dwg model are not visible from the Schedule functionality of Synchro Control. If the same 2D .dwg is us...
Thibault Dumas over 2 years ago in SYNCHRO Control / Models 7 Future consideration

Ability to bulk upload Actions/Scripts through Excel

No description provided
Arpit Prakash over 1 year ago in SYNCHRO Control / Forms / Inspection 0 Planned

When users are filling out a Form show message all Required fields need to be populated before continuing.

When users are filling out a Form show message all Required fields need to be populated before continuing. Once all required fields are filled in then the message should disappear.
David Dudek about 2 months ago in SYNCHRO Control / Forms 1 Unlikely to implement