Skip to Main Content
Need Support? Let’s guide you to the right answer or agent.
ADD A NEW IDEA

Pinned ideas

View all
PINNED Display Photo Count within Media Indexing
Add a display indicating “Photos 1 – 30 of 3,000 displayed” so users can see how many photos are logged.
PINNED I would like media Indexing to remember my Search preference like this week or Month instead of today
No description provided

All ideas

Showing 1322

To have the possibility in Synchro Control \ Schedule to display several 3D Windows based on different dates: current / baseline(s).

To be able to import in Synchro Control a Synchro 4D Pro .sp file which contains two or more 3D Windows. Different dates (i.e. current, baseline(s)) being used per 3D Window. To have all 3D Windows created in Synchro 4D Pro displayed in Synchro Co...
Thibault Dumas over 3 years ago in SYNCHRO Control / Models 0 Future consideration

Scaling of 3d object even after path is assigned

Unable to scale a 3D equipment after 3D path assignment and resource assignment to the task. Now, the erection scheme may change according to site conditions; in this case, to fix it, we always have to delete the 3D path and then recreate it, whic...
Vishal Khurana 4 months ago in SYNCHRO 4D Pro / 3D View/View Properties/Viewpoints/Layouts 0

Link between documents under Documents/Connections and plant set

Since we can now display the saved search under Synchro field, it may be easier to find a document under Documents or Connections. From there if the document exist under Plan Set, a Go To link should exist to allow user to move back and forth betw...
Luc Poulin 8 months ago in Field / Documents 1

Guests - option to have no Table / Calendar / Map buttons

We are using Synchro Control for guests to view the 4D model only and are not using any other features of Control. When a Guest logs into Synchro Control, it loads up for them on the Table tab and they see text saying: 'You have no assigned work'....
Ruth Fuller over 1 year ago in SYNCHRO Control / Models 0

Ability to uncheck Files during project registration or reprovision using organization template

Arpit Prakash 8 months ago in SYNCHRO Control 0

Filter form status in Schedule view

When managing form with multiple instances it is necessary to be able to filter out some of the statuses and work on the rest. i.e. in attached to filter out the backlog, not suitable and rejected and just leave the live instances. Either by allow...
Kiril Tasev 4 months ago in SYNCHRO Control / Forms 0

Ensuring Persistent Visibility of 'Assigned To' Information Throughout the Workflow

Once someone is assigned in a form as ‘Assigned to,’ I would like that information to remain visible throughout the entire workflow. a solution could be that whenever a person is in the binding 'Assigned to' during the workflow, each time someone...
Yessica Andrade Barbosa 8 months ago in SYNCHRO Control 0

Synchro Modeler idea: Exporting sliced 3D models into the source data format

Hi Synchro team, We are now using Synchro Modeler to prepare our 3D models and make them "4D ready". We are using the Slice and Work Area functionalities of Synchro Modeler. We also use Synchro 4D Pro to schedule the subdivided 3D objects into a 4...
Stephan Klotz almost 4 years ago in SYNCHRO Modeler 0 Needs review

Add ability to choose your own fields to sort by in MY WORK

Please add the same ability to pick and choose your own 'view' using the project specific fields that have been filled out in the MY WORK area. ( pic 1 ) Same ability as has been give under the individual forms ( pic 2 ) This will give our contrac...
Irena Seleznjova 4 months ago in SYNCHRO Control / Forms 0

Work Reference Order in SYNCHRO Perform App

Allow for sort (or at minimum set sort order to ascending by default) on Work References in the SYNCHRO Perform Mobile App
Ernest Downes about 1 year ago in Perform / SYNCHRO Perform Mobile 0