Skip to Main Content
Need Support? Let’s guide you to the right answer or agent.
ADD A NEW IDEA

Pinned ideas

PINNED SYNCHRO Field - Update Task Start date based off Earliest Resource Status
I am not sure if this is planned or not, but when we have the ability to update Resource Status through SYNCHRO Field, there should be an option (or Automatic) to change the status of the Task from Planned to Started, and also update the date to r...

SYNCHRO 4D Pro

Showing 242

Copy/paste tasks between open SP files

currently you can use copy as text/paste as text to copy tasks between 2 separate SP files improvement is to allow users to Copy Task/Paste Task (and all of it's properties) between 2 open SP files
over 5 years ago in SYNCHRO 4D Pro 0 Already exists

Add deselect option in resource assignment dialog when objects are already assigned to another resource

Often, you will forget to deselect a 3D object before selecting other objects to assign to a resource. In this case, at the end of the resource assignment wizard there is an option to either unassign the objects already in a resource, or cancel. I...
over 5 years ago in SYNCHRO 4D Pro 0 Future consideration

To be able to customize/add role in the personnel (Resource Group Properties)

It will be good to have the role to be customisable for personnel(under Resource Group Properties) to fit into industry or localisation requirement. For example, we do not have the term call superintendent in our local role and also for foreman, o...
Nabila Shahilla over 2 years ago in SYNCHRO 4D Pro / Cloud-hosted Control projects 0 Future consideration

Dropdown menu with suggestions when scripting

When writing/typing a script, there is only one suggestion displayed when entering the first letter(s). When entering the first letter(s), there should be a dropdown menu with multiple/all suggestions. This way scripting will be a lot easier.
over 5 years ago in SYNCHRO 4D Pro 2 Future consideration

There shall be two way mapping between 3D models and schedules. If we select any activity, the respective 3D model should be highlighted rest of the 3D objects shall be visible with least transparency.

It will be useful to analyse the intrfaces between two different disciplines
Ketan Gupta almost 3 years ago in SYNCHRO 4D Pro / 3D View/View Properties/Viewpoints/Layouts 0 Already exists

Display resource mapping in 3d view

Would it be possible to see the human resources allocation by color in the 3d view and be able to see where the human resource overallocation by area and also be able to use this to heat map red orange or green status for high levels of resources
Gerard Doheny almost 3 years ago in SYNCHRO 4D Pro / 3D View/View Properties/Viewpoints/Layouts 0 Already exists

Include Critical Path Test in the Schedule Health Check

The Schedule Heath Check report mentions the Critical Path Test as item 12. However the report does not perform the check automatically, instead the user should perform the test manually. With this addition the full DCMA-14 test can be performed w...
Michiel Janssens almost 3 years ago in SYNCHRO 4D Pro / Printing/Reports 0 Will not implement

Import Non labor data from Primavera P6 to Synchro

Currently I am not able to import non labor data to synchro. If we could import non labor data and apply global changes in the synchro itself it would be beneficial.
Ameya Talekar almost 3 years ago in SYNCHRO 4D Pro / Import/Export 0 Will not implement

Add Diameter Inch as New Unit in Synchro Rules

It's useful for user especially in O&G field which normally deal with pipe or gas line installation. With that Diameter Inch Unit will help a lot to measure the work rate within Synchro.
Owais Qarni almost 3 years ago in SYNCHRO 4D Pro / Tasks/Scheduling/Gantt Chart 0 Future consideration

To enable budgeted direct cost to be rolled up based on the task filter applied

The budgeted cost from filtered activities (based on task filters) in Synchro currently only rolls up to the overall total budgeted cost (meaning for all activities) instead of showing the cost of the filtered tasks itself. It would be helpful if ...
Nabila Shahilla almost 3 years ago in SYNCHRO 4D Pro / Tasks/Scheduling/Gantt Chart 0