PINNED Have the ability to move widgets and tables to a second monitor
Screen real estate to see the model is getting smaller with more widgets and tools can we move widgets to a second monitor?
PINNED SYNCHRO Field - Update Task Start date based off Earliest Resource Status
I am not sure if this is planned or not, but when we have the ability to update Resource Status through SYNCHRO Field, there should be an option (or Automatic) to change the status of the Task from Planned to Started, and also update the date to r...

All ideas

Showing 1323

Math Function in Data Grid

It is good if the Math function is available inside the data grid component. Also with Total row.
Indrawan Gmail over 2 years ago in SYNCHRO Control / Forms 0 Future consideration

Switch between Element and Alignment in Field app (Station Offset Tool)

It would be helpful to have the option to switch between element and alignment while using the station offset tool in the field app (Similar to Control - see attached)
Thomas Schimpf about 2 years ago in Field / Models | Tools 0 Future Consideration

Make a better customer support. Try to reach multiple times

No description provided
AMITH MOHAN 11 months ago in Perform 0

Disable permissions that are not relevant to Access

For example, if a Role only has Field access, the rest of the permissions that do not correspond to it, like Admin, should be greyed out -
Arpit Prakash almost 2 years ago in SYNCHRO Control / Admin 0 Future consideration

Display Resources Tree in Synchro Control \ Schedule

To have the possibility to access in Synchro Control \ Schedule the Resources Tree as defined in Synchro Pro. With possibility, in Synchro Control \ Schedule, to navigate between Resources window, 3D window and Gantt window the same way than in Sy...
Thibault Dumas over 3 years ago in SYNCHRO Control / Models 1 Future consideration

Delete Bindings

Want the ability to Delete a Binding(s) that are unused and unassigned on FORM Definitions
Derryl Acosta over 3 years ago in SYNCHRO Control / Forms 2 Planned

Scaling of 3d object even after path is assigned

Unable to scale a 3D equipment after 3D path assignment and resource assignment to the task. Now, the erection scheme may change according to site conditions; in this case, to fix it, we always have to delete the 3D path and then recreate it, whic...
Vishal Khurana 4 months ago in SYNCHRO 4D Pro / 3D View/View Properties/Viewpoints/Layouts 0

Escalate form to have an option to include attachments or not

When escalating the form from one to another, can we please have an option to whether the escalation will include the attachments or not from the previous form to the next form? This is important when the user access between the two forms are diff...
Guest over 2 years ago in SYNCHRO Control 0 Future consideration

Plan Revision Notifications

Notify users through e-mail when plan revisions are published.
David Gallaher over 2 years ago in SYNCHRO Control / Plan Sets 0 Future consideration

Resource Status Playback

SYNCHRO field to able to do Resource Status Playback
Indrawan Gmail about 2 years ago in Field / Status update | Resources 1 Future Consideration