Pinned ideas

View all
PINNED Have the ability to move widgets and tables to a second monitor
Screen real estate to see the model is getting smaller with more widgets and tools can we move widgets to a second monitor?
PINNED SYNCHRO Field - Update Task Start date based off Earliest Resource Status
I am not sure if this is planned or not, but when we have the ability to update Resource Status through SYNCHRO Field, there should be an option (or Automatic) to change the status of the Task from Planned to Started, and also update the date to r...

All ideas

Showing 1337

Ability to Tag members in the Comments

It would be great if you could Tag members in comments which would trigger a notification, and discussion
Kevin Vivien almost 4 years ago in SYNCHRO Control / Forms 2 Future consideration

Make Hierarchy tree and Inspection Group tabs accessible from a single page

The hierarchy tree config works with Inspection Groups and Attribute Forms but is in a separate admin module. They should all be on the same page for a unified workflow experience.
Arpit Prakash 12 months ago in SYNCHRO Control / Inspection 0

IFC Export

Hi the IFC export is very limitign: Only ifc 2x3 can be exported The PropertySets disappear and the ObjectTypes are not exported in the right way. I kindly ask you, to improve the IFC export as this file format is very popular and regularly used f...
Manuel Kraehenbuehl about 2 years ago in SYNCHRO 4D Pro / Import/Export 0 Future consideration

Ability to select Control by Binding Name

No description provided
Arpit Prakash over 1 year ago in SYNCHRO Control / Forms 0

To have the possibility to define a look-ahead filter for the Gantt window accessible from Synchro Control \ Schedule

Currently all Schedule Tasks within the Synchro 4D Pro .sp file are displayed in the Gantt Window accessible from Synchro Control \ Schedule. As we can have several thousands of Activities, it will be difficult for User to understand which are th...
Thibault Dumas over 3 years ago in SYNCHRO Control / Models 1 Future consideration

Export PDF without folder if no attachments available

This issue is in regards to exporting a PDF. When exporting a PDF to ProjectWise, a folder is created in ProjectWise with the exported PDF inside the folder. Is there a way to just export the PDF form without the addition of a folder. The AO that ...
Arpit Prakash over 1 year ago in SYNCHRO Control / Forms 0 Likely to implement

Delete Bindings

Want the ability to Delete a Binding(s) that are unused and unassigned on FORM Definitions
Derryl Acosta almost 4 years ago in SYNCHRO Control / Forms 2 Planned

Ability to publish Form data with Location to ArcGIS

No description provided
Arpit Prakash 12 months ago in SYNCHRO Control / Admin 0

Display Resources Tree in Synchro Control \ Schedule

To have the possibility to access in Synchro Control \ Schedule the Resources Tree as defined in Synchro Pro. With possibility, in Synchro Control \ Schedule, to navigate between Resources window, 3D window and Gantt window the same way than in Sy...
Thibault Dumas over 3 years ago in SYNCHRO Control / Models 1 Future consideration

Math Function in Data Grid

It is good if the Math function is available inside the data grid component. Also with Total row.
Indrawan Gmail almost 3 years ago in SYNCHRO Control / Forms 0 Future consideration