Skip to Main Content
Need Support? Let’s guide you to the right answer or agent.
ADD A NEW IDEA

Pinned ideas

View all
PINNED Have the ability to move widgets and tables to a second monitor
Screen real estate to see the model is getting smaller with more widgets and tools can we move widgets to a second monitor?
PINNED Display Photo Count within Media Indexing
Add a display indicating “Photos 1 – 30 of 3,000 displayed” so users can see how many photos are logged.

All ideas

Showing 1335 of 1335

To export worksheets to Excel with breakdown structure

It would be very useful when worksheets are exported to Excel to export its breakdown structure this names of summaries and indentions. Please, add this function.
Дмитрий Павлович Сергеев almost 4 years ago in SYNCHRO 4D Pro / Import/Export 0 Planned

Roles without Create but with Edit permission should not see the Form in Create dropdown

Roles with Edit permission can begin a Form from the Create dropdown menu and complete all fields but cannot Save it. This can be misleading and result in wasted time and frustration, especially when filling out lengthy Forms only to discover at t...
Arpit Prakash 12 months ago in SYNCHRO Control / Forms 0 Planned

Sorting in Time and Usage Matrix for People and Equipment, company, resource role etc

Currently the Matrix is set up to include People and Equipment in 1 table with sorting by Company, Role and Name. It is quite time consuming to have people and equipment mixed together. It would be good to be able to keep them separated and sortin...
Nageshwar Sesetti almost 3 years ago in EVM (Perform) / Timesheets 2 Future Consideration

Allow SYNCHRO Control forms to attach documents from Sharepoint repository

Many SP users do not like to maintain 2 data repositories, meaning they do not want to copy documents from SP into SYNCHRO document. They want to be able to attach documents residing in SP
Iwan Pribadi over 4 years ago in SYNCHRO Control / Forms 0 Future consideration

Ability Sort Schedule by Column Date or other

For some reason when I upload my Synchro 4d project to Synchro Control the schedule does not sort by Date or by ID for some reason, so the tasks look like they are all over the place and not in order.
David McLaughlin 3 months ago in SYNCHRO Control / Schedule 0

Enhanced Synchro Field Filtering and Visualization

In the Synchro Field application, it would be beneficial to have the ability to view all forms in a specific location. This could be achieved by implementing a map separator feature, similar to the "My Work" section, but within the "More" section....
Yessica Andrade Barbosa 3 months ago in Field / Forms | Forms 0

Ability to set Today's Date as a Binding in Forms

No description provided
Arpit Prakash 12 months ago in SYNCHRO Control / Forms 0

Costum Layout and Grid Control

I have a form with several grid controls, with several rows. I want to print it with Costum layout, with "flow" layout type. Those grid controls have several rows, which combined, surpass the size of one A4 sheet. When i try to print it, the table...
Miguel Meninas 12 months ago in SYNCHRO Control / Forms 0

Ability to upload PDF from PWDI to Plan Set

No description provided
Arpit Prakash 12 months ago in SYNCHRO Control / PDF Markup 0 Already exists

Ability to disable Assign To dialog for specific workflow transitions

This is helpful in instances where the final approval will always be the one that's assigned a closed Form. A good place to disable it would be under Forms > Set workflow > Edit transition button > Advanced > Include comment on transit...
Arpit Prakash over 1 year ago in SYNCHRO Control / Forms 0