Skip to Main Content
Need Support? Let’s guide you to the right answer or agent.
ADD A NEW IDEA

Pinned ideas

View all
PINNED Have the ability to move widgets and tables to a second monitor
Screen real estate to see the model is getting smaller with more widgets and tools can we move widgets to a second monitor?
PINNED I would like media Indexing to remember my Search preference like this week or Month instead of today
No description provided

All ideas

Showing 1310

Revision Control - duplicates can be created

Nothing stops an Inspector from creating a further inspection if it’s been created/started already – or no revision control to show this possible scenario.
Beth Buerger about 2 years ago in SYNCHRO Control / Inspection 0 Future consideration

Bulk Import - fail help

No assistance from ‘Published’ upon completion of the bulk import, just success i.e. if the import fails there is no help to fix the import worksheets. Would be nice for the user to understand why it failed and give feedback.
John Todd about 2 years ago in SYNCHRO Control / Inspection 0 Future consideration

Revision Control Upgrade

No bulk importing revision control, this means the import spreadsheet (revisions) will be held outside of the product. Would like to have some type of revision control inside the SYNCHRO web page
John Todd about 2 years ago in SYNCHRO Control / Inspection 0 Future consideration

move the card to header bar and shrink to save space for more important info

hello - refer to the screenshot.
Shaohua Guan about 2 years ago in SYNCHRO Control / Admin 0 Future consideration

Remove sort on this page

only 10 projects are being displayed. Sort can be deleted. or change it to "All Projects" at the bottom.
Shaohua Guan about 2 years ago in SYNCHRO Control / Admin 1 Will not implement

Import baselines created in P6 to Synchro

User creates multiple baselines in P6 and exports them as XML. He import P6 XML but he can't see baseline list in Synchro's Baselines and Scenarios window. User request this feature.
HoSang Jeon about 4 years ago in SYNCHRO 4D Pro 0 Will not implement

When accessing the model/marking up the model in work packaging, have components properties show when component is selected

i think with work packaging, it would be beneficial that when we access the model, mark the location, and create markets, the user to see the properties as they select components. that way the planner can mark up the model screenshots with the cor...
Doug Theret over 4 years ago in SYNCHRO Control / Models 2 Planned

Bulk convert Filters to Resources

It would be great if it was possible to convert all 3D filters to resources automatically. Then all Search Sets within Navisworks would convert directly to Synchro resources. It's possible to do manually currently.
Guest over 4 years ago in SYNCHRO 4D Pro 0 Future consideration

Drag and Drop Feature for File Attachments

The ability to drag and drop files as Attachments within Forms
Derryl Acosta over 4 years ago in SYNCHRO Control / Forms 1 Future consideration

Resource Planning & Physical Quantity and Resource Dependent Duration Type

I suggest to put into use one more way to calculate the task duration for tasks with "Work" Task Type. For this we need to implement one more Duration Type - "Physical Quantity and Resource Units Dependent" and one new parameter of Human Resource ...
Guest over 4 years ago in SYNCHRO 4D Pro 0 Future consideration