Skip to Main Content
Need Support? Let’s guide you to the right answer or agent.
ADD A NEW IDEA

Pinned ideas

View all
PINNED Publish from PW Create Rendition to SYNCHRO Control PDF
Can ProjectWise ICS printing of PDF publish directly to a SYNCHRO Control Project?
PINNED Integration with the Headlight app to transfer data captured in Headlight to SYNCHRO Control
No description provided

All ideas

Showing 1037

Ability to save and share dimensions/information from Measurement Tools

This would be extremely helpful when trying to convey information between stakeholders and allow for consistent information sharing as it is not always easy to target and select the exact point you are measuring in the model. Having the ability to...
Guest over 2 years ago in SYNCHRO Control / Models 2 Future consideration

Ability to autofill cascading dropdown list if only one option is avaible.

This would be a similar behaviour to Forms in BIC.
Arpit Prakash 4 months ago in Field 0

Ability to Tag members in the Comments

It would be great if you could Tag members in comments which would trigger a notification, and discussion
Kevin Vivien about 4 years ago in SYNCHRO Control / Forms 2 Future consideration

Include a Synchro Evacuation Process

This would assist the personnel, specifically the HSSE team on site when there is an evacuation emergency to manage the entire process. Synchro can add features below that can be used during an emergency evacuation: Supervisors seeing the names of...
Kaluba Josephine Changwe 7 months ago in EVM (Perform) / SYNCHRO Perform Mobile 1 Future Consideration

Integration of PDF document links with 3D model elements

Have PDF documents from the SYNCHRO Documents folder, such as "shop drawings or detail sheets" that can be accessed by clicking in the properties section of a 3D model that links directly to the PDF sheet it's referencing.
Tony Bonacorsi about 2 years ago in Field / Documents | Connections 1 Planned

Visualize non 3D resources in Control

Hi, Currently we can only graphically visualize the 3D resources assigned to tasks when the task is selected. Our users would like to see also the traditional resources that are assigned to tasks, i.e. human resources. This can be added in Task Pr...
Alexandru Buzan over 2 years ago in SYNCHRO Control / Schedule 0

Add inspections Group column in Forms Manager > Inspections

This will help easily identify which group a Form belongs to, instead of going to a separate tab.
Arpit Prakash about 1 year ago in SYNCHRO Control / Inspection 0

Roles without Create but with Edit permission should not see the Form in Create dropdown

Roles with Edit permission can begin a Form from the Create dropdown menu and complete all fields but cannot Save it. This can be misleading and result in wasted time and frustration, especially when filling out lengthy Forms only to discover at t...
Arpit Prakash about 1 year ago in SYNCHRO Control / Forms 0 Planned

Ability to disable Assign To dialog for specific workflow transitions

This is helpful in instances where the final approval will always be the one that's assigned a closed Form. A good place to disable it would be under Forms > Set workflow > Edit transition button > Advanced > Include comment on transit...
Arpit Prakash over 1 year ago in SYNCHRO Control / Forms 0

Message or a Tooltip on not being able to upload a file directly from zip

Add a message that files need to be unzipped before it can be uploaded. When selecting a PDF from zip, I am able to drag & drop. I get an error message that the PDF failed to upload. Maybe include a message at the top stating files that are in...
Derryl Acosta over 2 years ago in SYNCHRO Control / Plan Sets 0 Likely to implement