PINNED Have the ability to move widgets and tables to a second monitor
Screen real estate to see the model is getting smaller with more widgets and tools can we move widgets to a second monitor?

Models

Showing 54

Display the Resource Statuses in Synchro Control the same way than in Synchro™ 4D Pro

In Synchro™ 4D Pro it is possible to define several Resources Statuses and associate them to a Resource at a defined date. Then, if Color Mode of the 3D View is based on Resource Statuses, when moving the Timeline in the Gantt window of Synchro™ 4...
Thibault Dumas over 1 year ago in SYNCHRO Control / Models 0 Future consideration

View Control on multiple Monitors to improve workflows and clarity

Similar to how designers and split their desktop products onto multiple monitors, can we have this same functionality within Bentley web-based products. An example would be, I would prefer to see the Schedule Gantt Chart and details in one window,...
Corey Johnson almost 2 years ago in SYNCHRO Control / Documents / Forms / Maps / Models 1 Future consideration

Synchro Control iModel - User Field Info preferences

Upon selecting a 3D element in the iModel, some information is displayed in the side panel about it. I want the ability to display desired User Field information about the selected 3D Element: i.e., Work Package Number, System ID, Subcontract Pkg ...
Derryl Acosta about 2 years ago in SYNCHRO Control / Models 1 Future consideration

Reality Data/Visibility Tree cut off on Control

No description provided
Shaohua Guan about 2 years ago in SYNCHRO Control / Models 1 Future consideration

iModel connection status in Home view

Display the status of connection in 'Manage iModel' view so that it is not required to go to each iModel connection to see it.
Manoj Jamma about 2 years ago in SYNCHRO Control / Models 1 Future consideration

To apply to the 3D Window of Synchro Control \ Schedule the same 3D Filters than the one(s) activated at the time of the upload of the .sp file.

As an example, User would like to filter all 3D Objects not assigned to a Schedule Task (through corresponding Material Resources) prior to share the .sp file with stakeholders of the project through Synchro Control \ Schedule, so that unmapped 3D...
Thibault Dumas over 2 years ago in SYNCHRO Control / Models 0 Future consideration

To have the possibility to define a look-ahead filter for the Gantt window accessible from Synchro Control \ Schedule

Currently all Schedule Tasks within the Synchro 4D Pro .sp file are displayed in the Gantt Window accessible from Synchro Control \ Schedule. As we can have several thousands of Activities, it will be difficult for User to understand which are th...
Thibault Dumas over 2 years ago in SYNCHRO Control / Models 1 Future consideration

To have the possibility in Synchro Control \ Schedule to display several 3D Windows based on different dates: current / baseline(s).

To be able to import in Synchro Control a Synchro 4D Pro .sp file which contains two or more 3D Windows. Different dates (i.e. current, baseline(s)) being used per 3D Window. To have all 3D Windows created in Synchro 4D Pro displayed in Synchro Co...
Thibault Dumas over 2 years ago in SYNCHRO Control / Models 0 Future consideration

To be able to visualize in Synchro Control \ Schedule the Predecessors and Successors of a Task and to navigate between them.

As in Synchro 4D Pro to have the possibility when selecting a Task to view in Synchro Control \ Schedule the Predecessor(s) and the Successor(s) of the selected Task. When a task has been selected and its Predecessor(s) & Successor(s) displaye...
Thibault Dumas over 2 years ago in SYNCHRO Control / Models 1 Future consideration

Display Resources Tree in Synchro Control \ Schedule

To have the possibility to access in Synchro Control \ Schedule the Resources Tree as defined in Synchro Pro. With possibility, in Synchro Control \ Schedule, to navigate between Resources window, 3D window and Gantt window the same way than in Sy...
Thibault Dumas over 2 years ago in SYNCHRO Control / Models 1 Future consideration