Skip to Main Content
Need Support? Let’s guide you to the right answer or agent.
ADD A NEW IDEA

All ideas

Showing 20

Allow documents connections to different sources

Having a connection to ProjectWise is good, but consulting organizations use multiple document systems. To simplify workflows for consulting organizations with multiple documents sources working with owner/operators, contractors, other consultants...
Kerry Newbanks 10 months ago in SYNCHRO Control / Documents 0 Future consideration

Attachments within Transition Button

It would be usefull to have a way to also include attachments, as we do through the normal PDF export (in a folder for attachments), using the transition button in the workflow
Joana Isabel Neves Gomes 10 months ago in SYNCHRO Control / Forms 0 Future consideration

Print the PDFs into a single folder

When we select multiple PDFs and print them, it creates a folder for each of these PDFs. It should print them into a single folder.
Yessica Andrade Barbosa about 1 year ago in SYNCHRO Control / Forms 0 Future consideration

Add favorites on forms

Ability to favorite some forms so they can be easily prioritized in a grid view.
Manoj Jamma over 1 year ago in SYNCHRO Control 0 Future consideration

I want to update inspection form status for multiple forms at a time

As a user, when I select more than one inspection form in Admin/Manage Forms/Inspections, the Change Status and Delete buttons grey out. I'd like to be able to change the status of multiple forms at the same time.
Mariano Colicchio over 1 year ago in SYNCHRO Control / Inspection 0 Future consideration

refreshing browser does not land at where I was in browser. Retain view after refresh

When looking at a schedule of instances of a list of forms (more than 1000 instances) to get to a specific range of instances I have to click multiple times on the paginated list at the bottom of the register. Once there if I press F5 or refresh t...
Kiril Tasev over 1 year ago in SYNCHRO Control 0 Future consideration

New folder structure

In the 'Work' area as you add more forms the list just gets longer. It would be a good idea to have an expanding folder structure instead of a long list, as it is easier to navigate. This also assists with identifying different work areas and what...
David Beer over 1 year ago in SYNCHRO Control / Forms 0 Future consideration

UI improvements: Project Start/Finish date and progress

Create a UI to select a start and end date for a project when creating it, and allow project parties to see the progress of the current project on the home screen.
HoSang Jeon 11 months ago in SYNCHRO Control 0 Future consideration

Compare button in Schedule view

The "Compare" button in the schedule viewer needs some tooltips or explanation on what its purpose is. What is the difference between the top and bottom slider buttons? It also seems a little "clunky" when sliding. See this attached video
Thomas Whiteley over 4 years ago in [Archive] SYNCHRO 4D Review 1 Future consideration

Group vs Individual Saved View share setting behaviour

If a Group has multiple Saved Views within it, and we turn on Sharing, all the views become shared. However, if another non-shared View is added to a Shared Group, that and any other subsequent Views need to be individually shared manually. At th...
Arpit Prakash over 4 years ago in [Archive] SYNCHRO 4D Review 0 Future consideration