Skip to Main Content
Need Support? Let’s guide you to the right answer or agent.
ADD A NEW IDEA

Pinned ideas

View all
PINNED Add enable button to media indexing page to enable service if they have the RBAC role
If I don't have media indexing enabled on my project AND I'm an admin, we need to add a button her to enable it?
PINNED Integration with the Headlight app to transfer data captured in Headlight to SYNCHRO Control
No description provided

All ideas

Showing 513

User History in Resources Status from SYNCHRO Field

When working with SYNCHRO Field, multiple users can update Resources Statuses from the field. Subsequently, all updates that these users make are visible in the Resources Properties > Status > History window of SYNCHRO 4D Pro. However, only ...
Jean Delgadillo 7 months ago in SYNCHRO 4D Pro / Cloud-hosted Control projects 0 Future consideration

Button in 4D Pro for instant 'Synchronize changes from iModel Manager'

Please could a button be added to Synchro 4D Pro to allow you to 'Synchronize changes from iModel to Manager'. This would be invaluable as it would mean you would see the changes that have been made in Synchro Modeler much faster; as well as any c...
Ruth Fuller 11 months ago in SYNCHRO 4D Pro / Cloud-hosted Control projects 1 Future consideration

To have 2D coming from a .sp file displayed in Synchro Control

User has loaded in Synchro™ 4D Pro a 2D .dwg drawing to create the 4D animation. Once uploaded in Synchro Control the lines coming from the 2D .dwg model are not visible from the Schedule functionality of Synchro Control. If the same 2D .dwg is us...
Thibault Dumas about 1 year ago in SYNCHRO Control / Models 7 Future consideration

Contractor RFI Usage

It would be ideal be able to select the contract package and RFI is associated with. IE: SC01 - Civil Site, SC02 - Foundations, SC03 - Electrical, and on the RFI number it could be auto numbered as RFI-SC01-0001, RFI-SC02-0001. Allowing Contractor...
Guest over 1 year ago in SYNCHRO Control / Admin 0 Future consideration

refreshing browser does not land at where I was in browser. Retain view after refresh

When looking at a schedule of instances of a form (more than 1000 instances) to get to a specific range of instances I have to click multiple times on the paginated list at the bottom of the register. Once there if I press F5 or refresh the screen...
Kiril Tasev 29 days ago in SYNCHRO Control / Forms 0 Future consideration

New folder structure

In the 'Work' area as you add more forms the list just gets longer. It would be a good idea to have an expanding folder structure instead of a long list, as it is easier to navigate. This also assists with identifying different work areas and what...
David Beer about 2 months ago in SYNCHRO Control / Forms 0 Future consideration

Link existing Issues/Forms to Documents

It would be very useful to be able to link forms (RFI's, for instance) that are already created to a plan sheet or PDF document. Right now, the only way to connect PDFs with forms is by creating the form from the document, but you cannot link it o...
Rafael Ramirez Vizuete 8 months ago in SYNCHRO Control / PDF Markup 1 Future consideration

Private and Public markups

As a Construction Documentation management software, there should be a differentiation between public and private markups. As of now, any project member can markup any document, including plan sets, and those markups would be seen by everybody els...
Rafael Ramirez Vizuete 9 months ago in SYNCHRO Control / PDF Markup 0 Future consideration

Add the ability to create schedules for many models of one SynchroControl project.

Currently only one SynchroControl project model can be configured for the scheduling service ("Set up this iModel for scheduling service"). When a project is large in size or diligent, it is more convenient to split it into several models. Moreove...
Guest about 3 years ago in SYNCHRO Control / Admin 0 Future consideration

Display the Resource Statuses in Synchro Control the same way than in Synchro™ 4D Pro

In Synchro™ 4D Pro it is possible to define several Resources Statuses and associate them to a Resource at a defined date. Then, if Color Mode of the 3D View is based on Resource Statuses, when moving the Timeline in the Gantt window of Synchro™ 4...
Thibault Dumas over 1 year ago in SYNCHRO Control / Models 0 Future consideration