Skip to Main Content
Need Support? Let’s guide you to the right answer or agent.
ADD A NEW IDEA

Pinned ideas

PINNED Have the ability to move widgets and tables to a second monitor
Screen real estate to see the model is getting smaller with more widgets and tools can we move widgets to a second monitor?

Models

Showing 54

To have 2D coming from a .sp file displayed in Synchro Control

User has loaded in Synchro™ 4D Pro a 2D .dwg drawing to create the 4D animation. Once uploaded in Synchro Control the lines coming from the 2D .dwg model are not visible from the Schedule functionality of Synchro Control. If the same 2D .dwg is us...
Thibault Dumas about 1 year ago in SYNCHRO Control / Models 7 Future consideration

Display the Resource Statuses in Synchro Control the same way than in Synchro™ 4D Pro

In Synchro™ 4D Pro it is possible to define several Resources Statuses and associate them to a Resource at a defined date. Then, if Color Mode of the 3D View is based on Resource Statuses, when moving the Timeline in the Gantt window of Synchro™ 4...
Thibault Dumas over 1 year ago in SYNCHRO Control / Models 0 Future consideration

Synchro Control iModel - User Field Info preferences

Upon selecting a 3D element in the iModel, some information is displayed in the side panel about it. I want the ability to display desired User Field information about the selected 3D Element: i.e., Work Package Number, System ID, Subcontract Pkg ...
Derryl Acosta about 2 years ago in SYNCHRO Control / Models 1 Future consideration

To have the possibility to define a look-ahead filter for the Gantt window accessible from Synchro Control \ Schedule

Currently all Schedule Tasks within the Synchro 4D Pro .sp file are displayed in the Gantt Window accessible from Synchro Control \ Schedule. As we can have several thousands of Activities, it will be difficult for User to understand which are th...
Thibault Dumas over 2 years ago in SYNCHRO Control / Models 1 Future consideration

Display Resources Tree in Synchro Control \ Schedule

To have the possibility to access in Synchro Control \ Schedule the Resources Tree as defined in Synchro Pro. With possibility, in Synchro Control \ Schedule, to navigate between Resources window, 3D window and Gantt window the same way than in Sy...
Thibault Dumas over 2 years ago in SYNCHRO Control / Models 1 Future consideration

Have the ability to move widgets and tables to a second monitor

Screen real estate to see the model is getting smaller with more widgets and tools can we move widgets to a second monitor?
Dan Sheldon 11 months ago in SYNCHRO Control / Models 0 Future consideration

To have the possibility in Synchro Control \ Schedule to display several 3D Windows based on different dates: current / baseline(s).

To be able to import in Synchro Control a Synchro 4D Pro .sp file which contains two or more 3D Windows. Different dates (i.e. current, baseline(s)) being used per 3D Window. To have all 3D Windows created in Synchro 4D Pro displayed in Synchro Co...
Thibault Dumas over 2 years ago in SYNCHRO Control / Models 0 Future consideration

Any user field attributes from 4D Pro or Modeler are not visible in Control

Synchro Control model do not show any user field attributes added from 4D Pro or from Modeler. These attributes must be visible.
Manoj Jamma over 2 years ago in SYNCHRO Control / Models 0 Future consideration

more task filters options

Currently you can filter with a time frame and the 3d view will adapt to it. user should be able to filter by human resource, material resource, equipment resource, and location resource. user should also be able to filter by work package descipli...
Shaohua Guan over 3 years ago in SYNCHRO Control / Models 0 Future consideration

Ability to save and share dimensions/information from Measurement Tools

This would be extremely helpful when trying to convey information between stakeholders and allow for consistent information sharing as it is not always easy to target and select the exact point you are measuring in the model. Having the ability to...
Guest about 1 year ago in SYNCHRO Control / Models 2 Future consideration